Toronto, ON

How much does a dumpster cost in Toronto?

Toronto residential dumpster rentals typically run about $320–$1,050 CAD all-in depending on size, with 10–20 yard driveway jobs most common for home renovations. Street-permit placements add roughly $75–$150 and several business days. Dense laneway sites and weight overages move quotes more than the headline yard rate.

Pricing guidance last reviewed 2026-07-20

Quick answer

Toronto residential dumpster rentals typically run about $320–$1,050 CAD all-in depending on size, with 10–20 yard driveway jobs most common for home renovations. Street-permit placements add roughly $75–$150 and several business days. Dense laneway sites and weight overages move quotes more than the headline yard rate.

Toronto bin price ranges

All-in guidance (delivery, typical rental window, standard tonnage). Heavy materials, overages, and street permits change the final number.

Bin sizeBest forToronto price
10-Yard BinBathroom remodel, small cleanout$320 – $420
14-Yard BinFlooring tear-out, medium reno$380 – $510
20-Yard BinKitchen reno, roofing tear-off$470 – $640
30-Yard BinWhole-home clean-out, demo$680 – $860
40-Yard BinCommercial construction, large demo$860 – $1,050
Local tip-fee band
$125–$175 / tonne

GTA transfer-station tip fees sit at the high end of Canadian metros; wet loads and contaminated C&D push overages quickly.

Street permit add-on
$75–$150

Typical lead time: 3–5 business days. Driveway placement usually skips this fee.

City of Toronto permits & licences

What moves Toronto quotes

  • Driveway vs street placement (permit + lead time)
  • Included tonnage vs wet reno or shingle weight
  • Laneway / condo access that forces a smaller can or haul-away
  • Peak spring tear-off season capacity

FAQs

How much does a dumpster cost in Toronto?

Most residential driveway rentals land roughly $320–$640 for 10–20 yard bins all-in. Larger 30–40 yard cans and street-permit jobs cost more.

How much does a Toronto right-of-way bin permit cost?

Plan on about $75–$150 plus 3–5 business days. Many haulers pull the permit and fold the fee into your quote.

Why are Toronto quotes higher than suburban GTA?

Tip fees, tight access, and permit friction. A Mississauga driveway job often undercuts a downtown laneway drop of the same yard size.